Horizon Pipeline Capacity Expansion
Expanding and increasing production at the Horizon Oil Sands site
Pembina Pipeline Corporation | Canada | 2015-2016
Pipeline capacities up to250,000 bbl/d
六differentpump stations and terminals
Maintainedpipeline throughputduring construction
Challenges
- Each of the sites presented unique engineering challenges to achieve the design goals.
- Maintaining pipeline throughput during construction required extensive planning between Pembina’s project management, construction management, pipeline operations teams, the construction contractors, and Hatch.
Solutions
- To meet the demanding in-service date, we approached the work with a “divide-and-conquer” philosophy.
- 孵化's project manager oversaw all aspects of the project and managed three project engineers, who were each assigned two to three sites.
Highlights
- 孵化’s engineering team provided a quality design while meeting the aggressive project schedule and maintaining pipeline throughput during construction.
- This project was successfully completed on time and on budget.
Services & technologies provided
What's your challenge?
Related Projects

AP60 Smelter
Canada

Hardisty Operational Crude Tank
Hardisty, Alberta, Canada

Hell’s Kitchen Integrated Lithium and Power Project
Imperial Valley, California, USA

Vesta SWX Facilities & Pipeline
Alberta, Canada

Pump Station VFD Replacements
Alberta, Canada

Grand Falls Dam and Spillway Rehabilitation
Grand Falls, Newfoundland, Canada

Rosslyn Brewery Cogeneration Plant
South Africa
See All