Inflow Forecasting for Muskrat Falls Flood Management

Nalcor Energy | Canada | 2014

Automatic data acquisition and inflow forecasting
Scheduled dam construction at reduced cost
Improved worker safety at dam site

Challenge

  • During the construction of the Lower Churchill hydroelectric project in Labrador, Canada, Nalcor Energy needed to properly manage scheduling at the site.
  • 的Churchill Falls Generating Station has plant outflows ranging from 1000 m3/s overnight to 3000 m3/s during the day, so accurate inflow forecasts were also needed.
  • 的outflows significantly impact water volume at the Muskrat Falls dam site and the lower river, where peak spring flows can be as high as 6500 m3/s.
  • A software tool that could both manage the construction schedule and provide accurate forecasts of inflow volumes, especially during the spring runoff, was needed.

Solutions

  • 的inflowVistamodule ofVistaDSS™ was set up and calibrated for the lower Churchill River.
  • 的setup included six subwatersheds.
  • Flow releases from the upstream Churchill Falls hydroelectric generation station on the Churchill River, which constitute a large portion of the river flow at Muskrat Falls, are represented in the model.

Highlights

  • Vistaproduces continuous inflow forecasts that are updated daily, and route flows down the Churchill River to the Muskrat Falls project.
  • Vistaalso projects outflows and water levels at the Muskrat Falls dam site.
  • For short-term inflow forecasts,Vistafeatures automatic access of real-time hydrometric and weather data, snow course data, and pertinent meteorological forecast data.
  • To assess the risk of the river flow flooding the construction site, extended streamflow prediction forecasts are generated periodically using observed and historical temperature and precipitation data.


Project numbers

6sub-watersheds
6500 m3/speak spring flows
1000 m3/soutflows overnight to 3000 m3/s during the day