Jordan's IPP3

Guinness record: the world’s largest internal combustion engine power plant

Amman Asia Electric Power Co. & The Bank of Tokyo-Mitsubishi UFJ (Global Facility Agent) | Jordan | 2012 to present

World’s largestreciprocating engine
573 MWof generating capacity
3 fuel-typeburning ability (natural gas, light fuel oil, and heavy fuel oil)
24 monthsto complete the project

Challenges

  • This fast-tracked project was needed to provide energy security for Jordan.
  • Lenders required Equator Principles for environmental and social responsibility to be incorporated into the project.
  • The facility’s quick start-up capability and flexibility is key to efficiently and rapidly meeting sharp daily peaks in demand.
  • Fuel logistics was a challenge given that this plant near Amman was located 335 kilometres from the nearest fuel import terminal in Aqaba.

Solutions

  • We were selected as the lender’s engineer and conducted the technical due diligence to assist the project in reaching financial closure.
  • The construction monitoring that was conducted verified the progress and raised any issues to the lenders.
  • The performance test of the facility for operation on HFO and natural gas was witnessed in order to verify that the facility will perform as expected.
  • To ensure compliance with the Equator Principles on behalf of the lenders, we reviewed and monitored the implementation of the environmental and social management system through construction and into operations.

Highlights

  • Guinness World Record holder for the world’s largest internal combustion engine power plant.
  • Emission standards required the installation of a SCR and the plant to operate with HFO with less than 1% sulfur content.
  • This international project had participation from companies from various parts of the world (e.g. Jordan, Japan, Korea, Finland).
  • Flexibility provides a strong backbone for the local grid, so Jordan can continue with its plans to grow renewable energy for the country.

Project numbers

38x Wärtsilä 18V50DFreciprocating engines
Up to47.3% electrical efficiency
573 MWof generating capacity
US$800 millionapproximate project cost
30 minutesor less to achieve full load