generating units with optimized short-term generation schedules
Fewer
transitions while maintaining optimal dispatch
Stringent
water regulation requirements satisfied
Challenges
- The New York Power Authority needed to replace the legacy short-term scheduling software used at its St. Lawrence project.
- 软件had to work within the constraints of shared water-resource regulations between Canada and USA.
- 水releases had to be perfectly balanced between the Canadian and American plants on a daily and weekly basis.
Solutions
- STVista, the short-term scheduling module of Hatch'sVistaDSS™ decision-support software, will optimize short-term generation at NYPA's St. Lawrence power project.
- New functionality was developed in the form of additional operating constraints and run-control options.
- The software manages water rentals between both plants; implements multiple schedules for flat, daily peaking or weekly ponding operation; and transitions between non-navigation and navigation seasons.
- A custom user interface was also developed to simplify the use of the model for day-to-day operation within the control room environment.
Highlights
- Reduced the number of transitions, such as unit starts and stops, while maintaining optimal dispatch.
- Significantly strengthened automated data exchange between the scheduling software and other NYPA systems.
- Improved overall effectiveness of the scheduling process.
Project numbers
912 MWRobert Moses St. Lawrence Power Project in New York16hydro generating units
1,045 MWat adjacent R.H. Saunders Generating Station in Ontario
Services & technologies provided
What's your challenge?
Related projects
Grand Falls Dam and Spillway Rehabilitation
Grand Falls, Newfoundland, Canada
Kelso Dam: urgent repairs and rehabilitation project
Milton, Ontario, Canada
Oxec II Hydroelectric Project
Guatemala
Niagara Tunnel
Canada