25 MWAC
135000年
PV modules
210
acres
13,000
helical piles
Challenges
- Build a 210-acre, 25 MW solar farm in Canada's north.
- Project comprises three smaller developments (two 10 MW sites and one 5 MW site). Each site required a separate feed-in-tariff contract, renewable energy approval, and substation.
- Temperatures are below ˗40 °C for much of the year, so there were design and construction challenges related to deep frost and exposure limits.
Solutions
- 孵化acted as full-time, on-site owner's engineer.
- Provided detailed design basis, noise study documentation, regulatory applications and permit alignment, energy output assessment, and system modeling.
- Custom inverter housings and the longest piling foundation ever used in Ontario implemented to overcome deep frost challenges.
Highlights
- 13,000 helical piles used that could withstand potential frost heave while still allowing cost-effective and timely installation.
- Significant participation from local First Nations communities; Rainy River First Nations was majority project owner and formed a significant part of the project labor force alongside other local communities.
- Project outperforming expectations.
Project numbers
41,000 MW个小时啊f electricity per year20-yearpower purchase agreement
C$132.5 millionCAPEX
3,900households powered
What's your challenge?
Related projects
Grand Falls Dam and Spillway Rehabilitation
Grand Falls, Newfoundland, Canada
bob华体会
British Columbia, Canada
Mesquite Solar 1
United States of America
Kelso Dam: urgent repairs and rehabilitation project
Milton, Ontario, Canada
Oxec II Hydroelectric Project
Guatemala
Thunder Bay solar projects
Canada
Niagara Tunnel
Canada