Central Avenue Bridge Replacement
Replacing a 50-year-old bridge eases inter-modal traffic at Canada–US border
Regional Municipality of Niagara | Canada | 2014
Rapid bridge
replacement technique used successfully
Close consultation
& continuous coordination with CN rail
11,300
vehicles daily
Challenge
- Structural evaluation of the Central Avenue Bridge revealed that this 130 m long multi-span bridge could no longer support its posted loading capacity for truck traffic and needed to be replaced.
- The bridge was constructed in 1953 and carries 11,300 vehicles over a major rail corridor and Lewis Street, which provides a vital link to the Fort Erie Bridgeburg business district.
- The design of the new bridge required an innovative and technical solution.
- Careful attention to construction staging was also needed to keep traffic flowing into the Bridgeburg area and avoid disruption of the rail traffic crossing the US border.
Solution
- The bridge was designed in a manner to maintain CN operations as well as allow future flexibility for the expansion of the CN/CP shared portion of the rail corridor. Traffic impacts were minimized during replacement.
- The rapid bridge replacement technique was used to laterally slide the new superstructure from a temporary staging platform to the permanent substructure constructed under the existing bridge, minimizing the duration of a complete traffic shutdown.
Highlights
- Rapid bridge construction techniques using hydraulic jacking assemblies with steel rollers, positioned to launch structure to sit on permanent bearing seats on constructed abutment and piers.
- Design of the north section of the bridge structure allowed for future CN/CP rail expansion within their right-of-way.
- t分期设计和施工顺序o minimize traffic disruption on Central Avenue, including the building of a new substructure below the existing superstructure, and the new superstructure beside the existing one.
Project numbers
C$10 millionconstruction cost11,300daily vehicles
Services & technologies provided
What's your challenge?
Related projects

Highway 17 Noise Impact Assessment
Hewitson Creek, Ontario

Kingston Third Crossing (Waaban Crossing)
Kingston, Ontario, Canada

Three Chain Road project
Australia

Réseau express métropolitain
Montréal, Québec, Canada

Tugela River Pedestrian Bridge
South Africa

East Harbour Transit Hub
Canada

Sandton Rea Vaya Bus Rapid Transit Bridge
South Africa

Centennial Parkway
Canada

Port Mann/Highway 1
Canada

Umgeni Interchange
South Africa

Highway 404 Extension
Canada