864,758 LTI-free
manhours worked
Construction completed
in time for maintenance shutdown
8.36 km
of electrified railway line constructed
Challenge
- Expand the Khumani Iron Ore Mine, located 18 km south of the town of Kathu in the Northern Cape, on the Bruce, King, Mookaneng, and Parson farms
- Deviate the Postmasburg and Hotazel Transnet Freight Rail line in order to develop the King ore body and sustain the increased annual throughput
- Construct approximately 8.36 kilometers of electrified railway line and associated infrastructure including stormwater diversion
- Uplift and stack the existing perway and overhead traction equipment material
Solution
- Provided EPCM services for the implementation phase of the project
- Reviewed and confirmed the engineering and design deliverables undertaken as part of the Khumani Expansion project
- Undertook the procurement function required for and on behalf of Assmang Limited for the placement of supply contracts and construction packages
- Provided quality assurance and control of the supply and construction packages
Highlights
- Installation of perway
- Overhead traction equipment approved, with quality exceeding Transnet Freight Rail's expectation
- Project within budget
What's your challenge?
Related projects
Technical Advisor for Electric Bus and Infrastructure Loans
York, Ontario, Canada
MaineDOT Bus Electrification Project
Maine, USA
Caltrain Modernization Project
San Carlos, CA, USA