Soil removed and replaced over entire layout area
Critical subservice infrastructure identified and avoided
No refinery downtime
Challenges
- neede的过时的污水处理设施d to be replaced and upgraded so flow capacity could be increased, effluent could be treated consistently, odors reduced, and environmental and safety issues optimally managed and addressed.
- The existing inground API separators had to be replaced with new, aboveground units.
- A new, aboveground, closed dissolved-nitrogen flotation (DNF) system was installed as a more rigorous replacement for the existing aboveground dissolved air-flotation unit.
Solutions
- Engineering, procurement, and construction management services were provided to replace the refinery's wastewater treatment plant.
- Complete services included conceptual and feasibility studies, process engineering, detailed design, 3D modeling, demolition and relocation plans, process equipment procurement, subcontractor procurement, construction management, and start-up planning.
Highlights
- Combining all wastewater sewers into a common inground lift station with an automatic self-cleaning bar screen.
- Existing API separators were replaced.
- New dissolved nitrogen flotation unit was installed.
- New coagulant, polymer, and sulfuric acid chemical-feed systems were provided.
- A new controls and a master control center (MCC) building were constructed for the new equipment.
How we can help you
If you have a problem that needs to be solved, please get in touch.
Related Projects
水sampling at depth with drones
Canada, USA
Burnhamthorpe Water Project
Canada
Al Taweelah Alumina power and steam integration
United Arab Emirates
uMshwathi Regional Bulk Water Supply Scheme Phase 2
South Africa
水Outfall Project—MBR System
United States
Eagle Point Mine
Canada
Ranger Brine Concentrator
Australia
See All