First cable bridgein Ontario highway system
Increased, smoother, traffic flow
Expandedbridge capacity
Strengthenedtourism and the economyof Northern Ontario
Challenge
- Complete the work safely and thoroughly while meeting an accelerated construction schedule.
- Expand and upgrade this vital link for ground traffic, especially trade-related transport, between Western and Eastern Canada.
Solution
- Reconstruct the Highway 11 intersection and undertake miscellaneous works to ensure the maximum benefit can be derived from the new bridge.
- Provide construction contract administration for the duration of construction work.
Highlights
- 加拿大东部和西部之间的关键联系on the Trans-Canada highway is being protected.
- To condense the construction schedule, the tower units are being precast and post-tensioned.
- Precast deck panels are being used.
- Environmental monitoring is being conducted to ensure the upstream brook-trout-spawning areas are not impacted.
Project numbers
Construction cost of$106.4 millionA4 lane, two-spanstructure
First cable-stayed bridgebuilt in Ontario
What's your challenge?
Related projects
Highway 17 Noise Impact Assessment
Hewitson Creek, Ontario
Three Chain Road project
Australia
Kingston Third Crossing (Waaban Crossing)
Kingston, Ontario, Canada
Tugela River Pedestrian Bridge
South Africa
Réseau express métropolitain
Montréal, Québec, Canada
Sandton Rea Vaya Bus Rapid Transit Bridge
South Africa
East Harbour Transit Hub
Canada
Port Mann/Highway 1
Canada
Centennial Parkway
Canada
Umgeni Interchange
South Africa
Highway 404 Extension
Canada