Increased traffic flowbetween Canada and the USA
6 lane extensionof Canada's Highway 401 into Detroit
14 new overpassstructures
The Parkway trail:20 km within 120 ha of green space
Challenges
- A new transportation corridor was needed to directly connect Highway 401 in Windsor, Ontario, Canada, to Interstate 75 in Detroit, Michigan, USA, at the site of a proposed new bridge across the Detroit River.
- Traffic patterns needed to be studied to allow for a safe, efficient work environment while keeping traffic volumes moving during construction.
- An unprecedented amount of community involvement had to be successfully managed during the public consultation process due to the project’s proximity to residential neighbourhoods.
- A huge amount of high-quality design work had to be completed quickly and in a way that minimized construction costs.
Solutions
- Initiated major innovations that minimized material use and shortened construction times.
- Provided integrative and detailed design of highways, municipal roadways, drainage and stormwater management, road bridges, land tunnels, construction staging, electrical and advanced traffic management systems, urban design, and landscape architecture.
- Collaborated to produce seven public-information open houses and numerous workshops with agencies, stakeholders, and municipalities to provide information and obtain feedback on different project elements.
Highlights
- This was the first use of NU girders in Ontario.
- Construction on the parkway started in 2011, and generated approximately 12,000 jobs.
- Business opportunities were created for local and regional companies, attracting new investment and supporting existing industry.
Project numbers
C$1.4 billionconstruction cost5 year constructionperiod
350+ consultantsand technical specialists on the team
11 km of a six-lane extensionof Highway 401
12 tunnelswith a total length of 1.8 km
14 new overpassstructures
12signalized intersections
10 pedestriancrossings
20 kmof recreational trails
Services & technologies provided
What's your challenge?
Related projects
Highway 17 Noise Impact Assessment
Hewitson Creek, Ontario
Kingston Third Crossing (Waaban Crossing)
Kingston, Ontario, Canada
Three Chain Road project
Australia
Réseau express métropolitain
Montréal, Québec, Canada
Tugela River Pedestrian Bridge
South Africa
East Harbour Transit Hub
Canada
Sandton Rea Vaya Bus Rapid Transit Bridge
South Africa
Centennial Parkway
Canada
Port Mann/Highway 1
Canada
Umgeni Interchange
South Africa
See All