Silicon Valley Rapid Transit Project/BART
Alternative transit connecting San José to the San Francisco Bay area
Santa Clara Valley Transportation Authority | United States | 2008-2017
16.3mile extension
Tunneling in a dense urban environment
USD 6 billionin project costs
Challenges
- It was necessary to extend the BART system into downtown San José to provide a transit alternative to the highly congested I-680 and I-880 commuter corridors.
- San José was then able to become connected with the rest of the San Francisco Bay area.
- The extension meant that tunneling was needed through a dense urban environment in soft fluvial soils.
Solutions
- 孵化(in JV) was responsible for designing the tunnel segment: the alignment, tunnel lining and cross passage (CP) design, settlement analysis and mitigation, coordination with BART facilities standards, station interfaces, cost estimating, construction sequencing, and specification of owner-procured tunnel boring machine (TBM) and lining systems.
- We also were responsible for project management support services, project cost control, maintaining a trend log and estimating changes, performing independent cost estimates of proposed changes, and schedule controls for the entire Silicon Valley Rapid Transit project.
- Extensive geotechnical investigations included 101 borings, 179 cone-penetrometer tests, and six pumping tests.
Highlights
- 巴特扩展将提供备用运输options.
- It will reduce traffic congestion and eliminate approximately 16,000 tons of greenhouse gases in a year.
- It will also provide support for development along the length of the corridor.
- Overall cost and schedule-control management were seamlessly provided for a highly complex transit project.
Project Numbers
USD 6 billionin project costsServices & technologies provided
How we can help you
If you have a problem that needs to be solved, please get in touch.
Related Projects

Technical Advisor for Electric Bus and Infrastructure Loans
York, Ontario, Canada

MaineDOT Bus Electrification Project
Maine, USA

Minneapolis weathers the storm with a new parallel tunnel
Minneapolis, MN, USA

Mount Royal Tunnel double arch replacement
Montreal, Quebec, Canada
bob华体会
British Columbia, Canada

Burnhamthorpe Water Project
Canada

Réseau express métropolitain
Montréal, Québec, Canada
See All