Diridon Station is noted for itsItalian Renaissance Revival architectural style
Caltrain's average weekday ridership is67, 728
Abraham Lincolnwas President of the United States when Caltrain began operating in1863as Peninsula Commuter
Challenges
- 开发计划ning and operations analysis for Caltrain's South Terminal (Diridon Station), which supports five separate mainline railroad operators: Caltrain, Union Pacific Railroad, Amtrak Coast Starlight, Capital Corridor, and Altamont Corridor Express (ACE).
- Build on previous manual analyses by using comprehensive computerized network simulations under both non-randomized and randomized input conditions.
- Accommodate and analyze future operational plans, including Caltrain mixed electric and diesel-powered services prior to full Caltrain electrification.
- Quantify the capacity and reliability of two projects: Third Main Track (CP-Bird interlocking to north side of I-280/mile post 48.1) and Fourth Main Track (Centralized Equipment Maintenance & Operations Facility to Diridon Station).
Solutions
- 孵化LTK developed a comprehensive simulation model of the Caltrain Corridor, using its proprietary TrainOps™software to test the operating benefits of proposed South Terminal improvements.
- Using TrainOps™software, Hatch LTK was able to analyze the dynamics of all rail operations, including train performance, track geometry, dispatcher logic, train control, and terminal operations.
- Based on the analytical results of TrainOps™, the Fourth Main Track project was re-engineered to provide greater routing flexibility at the station's northern approach.
Highlights
- The adopted design of the Fourth Main Track project included complex "double slip" track switches that maximize the number of parallel moves (a northbound train leaving the station while a southbound train simultaneously enters a station on an adjacent track) for the five rail operators.
- The results of the project validated Caltrain's engineering designs for improvements and supported its negotiations with Union Pacific for operating protocols and engineering improvements for Caltrain electrification.
Project numbers
Caltrain operates on 77.4 miles (124.6 km) of trackUSD $6.3 million project
More than 100,000 people live and work within a half-mile of the streetcar route
Caltrain has 29 locomotives and 134 passenger cars in revenue service
How we can help you
If you have a problem that needs to be solved, please get in touch.
Related Projects
Technical Advisor for Electric Bus and Infrastructure Loans
York, Ontario, Canada
Wolbachia Mosquito Rearing Facilities
Brazil & Colombia
Li-Cycle Rochester Hub
Rochester, New York, USA
MaineDOT Bus Electrification Project
Maine, USA
Highway 17 Noise Impact Assessment
Hewitson Creek, Ontario
Minneapolis weathers the storm with a new parallel tunnel
Minneapolis, MN, USA
Mount Royal Tunnel double arch replacement
Montreal, Quebec, Canada
Boston Takes Charge of Zero-Emissions Opportunity
Boston, Massachusetts, USA
See All