Restoredstreetcar service to Tucsonafter more than eighty years
Daily ridership has grown to more than3,000 passengers
Challenges
- Integrate a modern streetcar line into the fabric of Central Tucson neighborhoods and the University of Arizona's main campus
- Develop a plan that is sensitive to the needs of other street users including motorists, bicyclists, and pedestrians
- Develop facility and systems designs of high-quality aesthetic with a minimally intrusive overhead contact system (OCS)
- Achieve a high level of operating safety using appropriate communications and traffic control technologies
Solutions
- Hatch LTK provided consulting engineering for the City of Tucson's streetcar system design
- Assisted with streetcar vehicle procurement and preliminary design development for all systems elements of the project
- Assisted in establishing functional requirements for the maintenance facility and developed its overall layout
- During final design and construction, Hatch LTK prepared technical specifications for the vehicles, participated in the industry review process, and assisted the City of Tucson with the evaluation of car builder proposals
- Conducted design review and provided oversight of production and testing
- Provided final design for the traction power system (substations, OCS, corrosion control), train-to-wayside control (TWC) to protect train movements in city streets, communications (CCTV and integration of the bus automatic vehicle location and communications system into the streetcar design), and fare collection
Highlights
- The line opened to passengers on July 25, 2014
- Eight modern streetcars are used on the 3.9-mile (6.3 km) double-tracked alignment, serving twenty-one stations
- 一个座位re designed to flip up to provide room for passengers who board with bikes
Project numbers
USD$196 millionprojectIt was Tucson's largest construction project ever, and it has already made positive impacts, including:500construction jobs created, 1,500-plus new housing units, 50-plus new restaurants, bars, and cafes along the route,63美元million-plusin streetcar federal funds,$800 millioninvested from the private sector to-date along the route
More than100,000people live and work within a half-mile of the streetcar route
According to a study on streetcar demographics,67%of riders are students and25%are working professionals
How we can help you
If you have a problem that needs to be solved, please get in touch.
Related Projects
Technical Advisor for Electric Bus and Infrastructure Loans
York, Ontario, Canada
MaineDOT Bus Electrification Project
Maine, USA
Caltrain Modernization Project
San Carlos, CA, USA