
Gold mine in Western Australia
Debottlenecking an underground mine with dynamic simulations
Confidential | Australia | 2014
1,000+
dynamic simulations conducted in 2 months
50% increase
in production targeted in long-term strategy
16-week study
to identify and fix bottlenecks
Challenges
- Help ensure the continued viability of the gold mine by increasing haulage from underground operations.
- Address logistical bottlenecks preventing the company from reaching its five-year capacity goal for the mine.
- Improve efficiency by improving throughput without adding new equipment.
Solutions
- Mapped the mine's design, including haulage routes and stockpiles.
- Linked a dynamic model to the mine's planning software, tracking the flow of goods, people, and machinery on site, including scheduling, decision rules, and fine details.
- Identified jumbo operations to be the main bottleneck, and found opportunities to improve prioritization of stoping and production activities.
- Used a dynamic model to empower the company, enabling it to challenge traditional operating and planning practices in a workshop environment.
Highlights
- Numerous productivity improvements and strategic expansion options evaluated in just two months.
- Simulations tested fleet-configuration options and capabilities of jumbos, boggers, and haul trucks.
- Complex rules and interdependences for this operation were shared, collecting knowledge to help the company make better decisions.
- Dynamic model is being used to target a five-year, 50% increase in production through underground mine expansion options.
Project numbers
1,000+ dynamic simulations16-week study
What's your challenge?
Related projects

Gold mine in Western Australia
Australia
hth登录官网
North America

Organizational design and right-sizing
North America
hth官方网址
Asia

孵化-Glencore Technology Venture
加拿大安大略省萨德伯里

Water sampling at depth with drones
Canada, USA

San Francisco to Tamien: Electrification construction work windows development
San Francisco, CA, USA

TraPac Terminal Automation Support
United States

Mesquite Solar 1
United States of America

Al Taweelah Alumina refinery operational readiness
United Arab Emirates

Traction Power and Systems Capacity Analysis for Systemwide Cascade Plan
Melbourne, Australia
app下载华体会
Brazil

Austin Freight Operations and Maintenance Business Plan
Austin, TX, USA

Al Taweelah alumina refinery
United Arab Emirates (UAE)

Tenke Fungurume Mine
Democratic Republic of Congo

Faustina Brownfield Fertilizer Plant
United States

Alumar Unit 2
Brazil

Jamalco Phase One
Jamaica

Dalrymple Bay Coal Terminal 7X Project
Australia