Ma’aden Bulghah Gold Project
Ma’aden (Saudi Arabian Mining Company) | Saudi Arabia | 2006
Heap leaching
in a remote, hot, and arid environment
37.8 hectares
of leach-pad area added
Challenges
- Construct a gold heap-leach facility in two phases, each consisting of leach pads covering approximately 37 hectares in area
- Provide detailed design for the heap-leach pad in a remote, hot, and arid environment
Solutions
- 孵化provided detailed engineering design and documentation for the Stage 2 extension to the existing heap-leach pad
- Services included detailed design and documentation to prepare an additional 37.8 hectares of heap-leach pad, allowing the existing conveyor systems to be relocated
- The Stage 2 pad was designed to tie in and provide a seamless extension to the operating Stage 1 pad
Highlights
- The detailed design of the heap-leach pad for this gold-extraction operation took place in a remote, hot, and arid environment.
- New works were designed to tie into an existing operational heap-leach pad
Project numbers
37.8 hectaresof leach-pad area addedWhat's your challenge?
Related projects

Gold mine in Western Australia
Australia

DST Demonstration Plant
Canada

Twin Creeks Mercury Abatement Project
Nevada, USA

Tasiast Expansion Project
Mauritania

Twin Creeks Autoclave Tonnage Improvement
Nevada, USA

Meadowbank Gold Project
Canada

Pueblo Viejo – Pressure Oxidation & Air Separation Project
Dominican Republic