33,700 to 48,000 tpd
increase in throughput
2x
rougher flotation retention time
Increased
capacity in the existing grinding cyclones
Increased
capacity in the existing deslime cyclones
Challenges
- The mill struggled with ore variability and hardness, producing a copper concentrate with gold and silver credits that decreased throughput, and ultimately reduced metal and concentrate production.
- One of the main challenges of this brownfield operation was installing the circuits within existing process infrastructures without disturbing ongoing operations.
- Integrating the new circuits required a lot of planning to ensure the scheduled shutdown and process commissioning was kept to a minimum.
Solutions
- Provided detailed engineering, procurement assistance, and field support for the project.
- A two-phased expansion of the mill facilitated the increased throughput.
- Phase 1 added a new secondary crushing and screening circuit to decrease feed particle size to the SAG mill.
- Phase 2 expanded the grinding, rougher flotation, and tailings deslime areas, increasing capacity in the existing grinding cyclones and the deslime cyclones, and doubling the rougher flotation retention time.
Highlights
- Increased overall mill throughput from 33,700 to 48,000 tons per day
- Increased capacity in the existing grinding cyclones
- Doubled the rougher flotation retention time and increased the capacity in the existing deslime cyclones
Project numbers
US$8.5 million33,700 to 48,000 tpdincrease in overall mill throughput
What's your challenge?
Related projects
Li-Cycle Rochester Hub
Rochester, New York, USA
Voisey's Bay Mine Expansion
Canada
Resolution Copper Mine — No. 9 Shaft Deepening Project
Arizona, United States
hthvip华体会
Australia
Tenke Fungurume Mine
Democratic Republic of Congo
Mina Ministro Hales
Chile
Kamoto Refinery & Roaster Refurbishment
Democratic Republic of Congo