110,000 tpa
of uranium oxide produced
1.83 gigalitres
of tailings water purified for discharge to wetland filters annually
620,000
work hours with
0 LTIs
Challenges
- After three decades, Australia's longest continually operating uranium mine is one of only three in the world to produce over 110,000 tonnes of uranium oxide per year.
- Located adjacent to World and National Heritage sites and Aboriginal land, the mine is subject to some of the world’s strictest environmental protection regulations.
- Environmentally-sound brine-concentrator technology must reduce process water inventory and manage the impacts of heavy rainfalls.
- 水from the mine tailings must be processed to produce 1.83 gigalitres of highly pure water suitable for discharge through wetland filters each year.
Solutions
- Conducted feasibility study and completed project as the EPCM contractor with a peak on-site team of 25.
- Scope included design and supply of the brine-concentrator technology package with supporting facilities.
- Used thermal energy and environmentally sound technology to treat tailings water and evaporate, condense, and discharge it, clean and distilled. ERA is now able to reduce its process water inventory and manage heavy rainfalls.
- Equipment design and manufacturing took place in Australia and abroad, in full compliance with stringent applicable local standards.
Highlights
- The A$220 million brine-concentrator project was delivered on budget and schedule by our EPCM team.
- The project required management of contractors in a remote part of the Northern Territory.
- A site office was established and Hatch systems were put in place to manage contractors.
- Commissioning took place in the second half of 2013.
Project numbers
A$220 millionCAPEX~620,000work hours with no LTIs
Services & technologies provided
What's your challenge?
Related projects
hth登录官网
North America
Cigar Leach Hydrogen Mitigation Project
Saskatchewan, Canada
Eagle Point Mine