38,000 tpd
process plant
10 million
hours with 0 LTIs
US$400 million
in cost savings
Challenges
- 扩大现有Tasiast金矿38000nnes per day (tpd) by constructing a new process facility, workforce accommodations, water pipeline, power station, water treatment, and distribution system.
- With heat, winds, and dust storms, delivering materials and equipment to the site needed special logistics.
- Examine a range of different processing technologies and plant capacities, considering trade-offs.
Solutions
- Phase 1 included designing and constructing infrastructure to support existing operations and a potential expansion.
- Studies determined that a single new 38,000 tpd process plant would be optimal economically.
- We provided EPCM for accommodations for a 3,500-person workforce, a 60 km water-supply pipeline, water treatment facilities, power plant, and truck shop.
Highlights
- Received the 2013 Kinross Safety Award
- The project team included a multinational construction labor-force from Mauritania and regional countries
- Savings of almost US$400 million realized during the feasibility study
Project numbers
>US$1 billionPhase 1 Infrastructure cost3,500labor force at peak
Services & technologies provided
What's your challenge?
Related projects
Gold mine in Western Australia
Australia
DST Demonstration Plant
Canada
Twin Creeks Mercury Abatement Project
Nevada, USA
Twin Creeks Autoclave Tonnage Improvement
Nevada, USA
Meadowbank Gold Project
Canada
hthcom华体会
Saudi Arabia
Pueblo Viejo – Pressure Oxidation & Air Separation Project
Dominican Republic